Waterproofing systems

Waterfront decks

Waterfront properties get the worst of the weather and the best of the view. The surface has to survive wind-driven rain hitting it sideways, salt air, and a damp that never fully leaves between October and April.

Exposure Coastal / marine

Why it works

What this actually involves

In short

  • Formulated for constant damp, salt air and wind-driven rain
  • Slip-resistant wet, and comfortable underfoot barefoot
  • Mould and mildew inhibitors built into the membrane itself
  • Expands and contracts with temperature without splitting
  • Seasonal wash is the entire maintenance schedule

Duradek's PVC membrane is formulated with the elasticity to expand and contract through that cycle without cracking, chipping or peeling. Mould and mildew inhibitors are built into the sheet rather than applied to it, so they do not wash off with the first winter.

It is also textured, which matters more on a waterfront deck than anywhere else. A surface that is permanently wet needs to be slip-resistant when wet, and comfortable enough to cross barefoot on the way back from the dock.

It gets installed once. After that it needs a wash, and nothing else.

Assembly detail

You are not buying a deck surface.
You are buying the ceiling below it.

Duradek is one sheet doing two jobs. It is the waterproofing and it is the floor you walk on, which means there is no seam between the two for water to find.

Where it matters most is the point the drawing shows on the left: the membrane turns up the wall and sits behind the cladding, so the drainage plane runs unbroken from the deck into the building envelope. That detail is invisible when we are finished. It is also the reason the deck is still dry long after a caulked joint would have let go.

Cross-section of a Duradek vinyl deck assembly Rain falls onto a 60 mil PVC membrane laid over plywood sheathing on joists. The membrane slopes to drain and turns up the house wall behind the cladding. The room beneath the deck is shown lit and dry. CLADDING (CUT AWAY) DRY HABITABLE SPACE BELOW WELDED SEAM MEMBRANE TURNS UP BEHIND CLADDING 60 MIL PVC SLOPED TO DRAIN
  • Membrane turns up behind the cladding
  • Hot-air welded seam
  • 60 mil PVC membrane
  • Sloped to drain
Fig. 1 — Duradek assembly at the house connection
Also available

Want a number for this?

We measure on site, check what is underneath, and give you an itemised quote with a timeline. No charge and no obligation.

Call Estimate