About

We do one thing, and it is the part you cannot see.

RhinoDecks is a deck waterproofing contractor in Burnaby working across Metro Vancouver. We are authorised Duradek installers, which means our crews are trained and certified on the detailing rather than just the product.

Installer kneeling on a deck frame, fastening boards over the joists with a drill

Why the detailing is the job

Almost nobody calls a deck contractor because the middle of their deck failed. They call because water got in at an edge — where the deck meets the house, where a post comes through, where a stair lands. The flat field is the easy part of any waterproofing job. The terminations are where the work is, and they decide whether a deck stays dry or quietly rots from the edge in.

That is why we install one product rather than a waterproofing layer with a separate wearing surface on top. Two products means an interface between them, and an interface is a thing that can come apart. Duradek is 60 mil of PVC doing both jobs at once, laid in full sheets.

What you can expect from us

We will tell you at the consultation if the structure underneath is not sound, before we start rather than after. We obtain the permits where the work needs them and schedule the inspections. We give you an itemised quote with a timeline in writing, and we hand over the warranty documentation at the walkthrough.

If a job is not right for vinyl, we will say so. A membrane over rotten sheathing hides a problem rather than fixing one, and we are not interested in being the contractor who did that.

Assembly detail

You are not buying a deck surface.
You are buying the ceiling below it.

Duradek is one sheet doing two jobs. It is the waterproofing and it is the floor you walk on, which means there is no seam between the two for water to find.

Where it matters most is the point the drawing shows on the left: the membrane turns up the wall and sits behind the cladding, so the drainage plane runs unbroken from the deck into the building envelope. That detail is invisible when we are finished. It is also the reason the deck is still dry long after a caulked joint would have let go.

Cross-section of a Duradek vinyl deck assembly Rain falls onto a 60 mil PVC membrane laid over plywood sheathing on joists. The membrane slopes to drain and turns up the house wall behind the cladding. The room beneath the deck is shown lit and dry. CLADDING (CUT AWAY) DRY HABITABLE SPACE BELOW WELDED SEAM MEMBRANE TURNS UP BEHIND CLADDING 60 MIL PVC SLOPED TO DRAIN
  • Membrane turns up behind the cladding
  • Hot-air welded seam
  • 60 mil PVC membrane
  • Sloped to drain
Fig. 1 — Duradek assembly at the house connection
How a job runs

From the first call to the walkthrough

  1. Consultation

    We come to the property, measure, and check what is already there — the substrate, the framing, the condition of the wall connection. You get an honest read on whether the existing structure can be built over, and we show you samples.

    Free, on site
  2. Design and quote

    An itemised proposal: materials, colour, the detailing the job needs, a timeline, and the price.

    Written, itemised
  3. Preparation

    Structural inspection, then substrate preparation. Anything rotten gets replaced before the membrane goes down, because a waterproof surface over bad sheathing just hides the problem.

    Before any membrane
  4. Installation

    The membrane goes down in full sheets, and the detailing at walls, posts and stairs is done by installers trained on that specifically. Most residential decks take two to five days.

    2-5 days typical
  5. Walkthrough

    We walk the finished deck with you, check every termination, hand over the warranty documentation and the care instructions. You can use the deck the same day.

    Warranty handover

Find out what your deck needs.

We come out, measure, check the structure underneath and tell you what the job actually involves. The estimate is free, itemised and yours to keep.

Call Estimate