Deck construction

Rooftop deck building

A rooftop deck sits over rooms people live in, which changes what the surface has to do. It is not a patio that happens to be high up — it is a roof you walk on, and it has to satisfy the building code as both.

Assembly Roof + deck, one membrane

Why it works

What this actually involves

In short

  • Code-approved as a roofing membrane over habitable space
  • Waterproof and walkable in one product, not two stacked layers
  • Installed by authorised professionals trained in waterproof detailing
  • UV stable: will not crack, chip or peel through freeze-thaw cycles
  • Best return on square footage in dense urban lots

Duradek is approved as a roofing membrane over habitable space and as a pedestrian walking surface in a single application. That matters because the alternative is two products stacked on each other: a waterproofing layer, then a separate wearing surface on top of it. Two products means two failure points, two warranties, and a leak that is nobody in particular's responsibility.

We install the membrane as one continuous sheet and carry it up the wall behind the cladding at the house connection. Water that lands anywhere on the deck has no seam, fastener or joint to find. The room underneath stays dry, and you gain the square footage without extending the footprint of the house.

Assembly detail

You are not buying a deck surface.
You are buying the ceiling below it.

Duradek is one sheet doing two jobs. It is the waterproofing and it is the floor you walk on, which means there is no seam between the two for water to find.

Where it matters most is the point the drawing shows on the left: the membrane turns up the wall and sits behind the cladding, so the drainage plane runs unbroken from the deck into the building envelope. That detail is invisible when we are finished. It is also the reason the deck is still dry long after a caulked joint would have let go.

Cross-section of a Duradek vinyl deck assembly Rain falls onto a 60 mil PVC membrane laid over plywood sheathing on joists. The membrane slopes to drain and turns up the house wall behind the cladding. The room beneath the deck is shown lit and dry. CLADDING (CUT AWAY) DRY HABITABLE SPACE BELOW WELDED SEAM MEMBRANE TURNS UP BEHIND CLADDING 60 MIL PVC SLOPED TO DRAIN
  • Membrane turns up behind the cladding
  • Hot-air welded seam
  • 60 mil PVC membrane
  • Sloped to drain
Fig. 1 — Duradek assembly at the house connection
Also available

Want a number for this?

We measure on site, check what is underneath, and give you an itemised quote with a timeline. No charge and no obligation.

Call Estimate