Pool and hot tub surrounds

Pool and hot tub decks

A pool surround has a specific set of problems: chlorinated splash-out, bare wet feet, and a surface that bakes in direct sun all afternoon.

Standard ICC-ES AC39

Why it works

What this actually involves

In short

  • Chemical resistance tested to ICC-ES AC39
  • Heavy texture for grip where people are wet and barefoot
  • More comfortable underfoot than concrete or aggregate
  • Spills and sunscreen wipe off instead of staining
  • Durarail enclosure and gate options for pool safety compliance

Duradek is tested and approved for chemical resistance under ICC-ES AC39, so pool and spa chemistry does not degrade it. The surface is heavily textured for grip in exactly the conditions where people slip, and it is far more forgiving on bare feet than broom-finished concrete or aggregate.

It also cleans easily. Sunscreen, spilled drinks and leaf stain wipe off rather than soaking in, which is most of what pool deck maintenance actually consists of.

Durarail railing and self-closing gate assemblies are available where a pool enclosure is required by code.

Assembly detail

You are not buying a deck surface.
You are buying the ceiling below it.

Duradek is one sheet doing two jobs. It is the waterproofing and it is the floor you walk on, which means there is no seam between the two for water to find.

Where it matters most is the point the drawing shows on the left: the membrane turns up the wall and sits behind the cladding, so the drainage plane runs unbroken from the deck into the building envelope. That detail is invisible when we are finished. It is also the reason the deck is still dry long after a caulked joint would have let go.

Cross-section of a Duradek vinyl deck assembly Rain falls onto a 60 mil PVC membrane laid over plywood sheathing on joists. The membrane slopes to drain and turns up the house wall behind the cladding. The room beneath the deck is shown lit and dry. CLADDING (CUT AWAY) DRY HABITABLE SPACE BELOW WELDED SEAM MEMBRANE TURNS UP BEHIND CLADDING 60 MIL PVC SLOPED TO DRAIN
  • Membrane turns up behind the cladding
  • Hot-air welded seam
  • 60 mil PVC membrane
  • Sloped to drain
Fig. 1 — Duradek assembly at the house connection
Also available

Want a number for this?

We measure on site, check what is underneath, and give you an itemised quote with a timeline. No charge and no obligation.

Call Estimate